11.4. Removal of the transmission

 PERFORMANCE ORDER

Work is carried out on a viewing ditch or the elevator.

We disconnect "minus" a wire from the rechargeable battery.
We remove the transfer case with an intermediate shaft (see Removal of the transfer case).
We disconnect wires from the switch of lamps of a backing (see Replacement of the switch of lamps of a backing).
Having turned off bolts of fastening of the working cylinder of coupling to a coupling case (see Removal of the working cylinder of a hydraulic actuator of coupling), we take away the cylinder forward, without separating a hydraulic actuator.

In salon by the crosswise screw-driver it is turned off two self-tapping screws of fastening of a plastic cover of the lever of gear shifting.

Having removed the handle from a lever core, …

… we uncover with a rubber cover.

Operations on removal of a core of the lever are for descriptive reasons shown on the dismantled transmission.
Having pressed a lever core down, …

… the screw-driver we hook petals of the locking plug …

… also we bring them out of a ring flute of a core.

We remove a gear shifting lever core.

The screw-driver we unclench petals of the remote plug …

… also we remove it from the lever.

We remove rubber elastic from the lever …

… and locking plugs.

Having hooked the screw-driver, from an opening of a core of the lever we take one more elastic plug …

… and persistent pillow.

We turn off bolts of fastening of a starter to a coupling case (see Removal of a starter).
On the VAZ-21214 car, having turned off the top bolt of fastening of a starter, we release the lower end of a back basic arm of an inlet pipe of the engine.

Head "on 13" we turn off a bolt of fastening of the top end of a basic arm to an inlet pipe …

… also we remove an arm.

We dismantle the forward driveshaft (see Removal of the driveshaft).

Key "on 10" we turn off four bolts of fastening of a cover of a case of coupling.

Head "on 13" we turn off a bolt of fastening of a collar of a reception pipe to an arm.

We take out a bolt.

Cap key "on 13" we turn off two nuts of fastening of an arm to the transmission.

We take out a "mortgage" bolt.

We remove an arm.

By head "on 19" with the cardan hinge and the extender it is turned off four bolts of fastening of the transmission to the block of cylinders.

Head "on 13" we turn off two nuts of fastening of an arm of a support of the transmission (the third support of the power unit).

Head "on 13" we turn off four nuts of fastening of a cross-piece of a back suspension bracket of the power unit to a body.

We remove a cross-piece with a support.

Having given the transmission back, we remove it.

At removal or installation of the transmission it is impossible to opirat a main shaft of a box on coupling knots that not to damage them.
We install the transmission in the return sequence.
Before installation the end of a main shaft is applied a thin film of SHRUS-4 lubricant on shlitsevy. After installation of a box we regulate a free wheeling of a pusher of a fork of switching off of coupling (see Adjustment of the drive of switching off of coupling).

Before installation of a core on the lever of gear shifting we insert a pillow and plugs into a core opening.