11.3. Replacement of an epiploon of a secondary shaft

 PERFORMANCE ORDER

Work is carried out on a viewing ditch or the elevator.

We remove the transfer case with an intermediate shaft (see Removal of the transfer case).

We remove the rubber aligning ring.

To stop a flange from a provorachivaniye, we insert a bolt of fastening of the elastic coupling into its opening.

Head "on 30" we turn off a nut of fastening of a flange …

… also we remove it (the nut is established on carving sealant).

We remove a washer (it is established by camber to a nut).

Through a long drift from soft metal we strike blows to a flange, turning it.

Also the flange can be removed a three-armed stripper (the photo is made on the dismantled box).

We remove a flange.

Having hooked the screw-driver an epiploon of a secondary shaft, …

… we remove it.

Having greased a working surface of an epiploon with a thin layer of Litol-24 lubricant, we press its suitable piece pipes. We establish the dismantled details upside-down.