11.2. Replacement of an epiploon of a main shaft

 PERFORMANCE ORDER

Work is carried out on a viewing ditch or the elevator.

We remove the transmission (see Removal of the transmission).

Head "on 13" we turn off one nut in the lower part of the transmission, …

… and a head "on 17" we turn off six more nuts.

We separate a coupling case from the transmission.

Having hooked an assembly shovel or the screw-driver an epiploon, …

… we take it from a coupling case nest.

Having greased a working surface of an epiploon with a thin layer of Litol-24 lubricant, …

... we press its suitable piece pipes (outer and internal not less than 35 diameter).

Assembly is carried out in the return sequence.
Sealing laying between cases is replaced new and we grease with a thin layer of silicone sealant.